Goethe-NHR

Goethe-NHR is a general-purpose computer cluster based on several CPU/GPU architectures. The system was installed in Industriepark Höchst in 2019 and extended with GPU nodes in 2020. In 2025, the cluster moved to the Green IT Cube in Darmstadt.

Cluster performance:

  • Cluster performance peak: 1,449.98 TFlop/s (with 472 nodes)
  • Cluster performance HPL (2018): 958.67 TFlop/s (with 472 nodes)
  • GPU cluster performance HPL (2023): 9,087.00 TFlop/s (with 105 nodes)

Hardware:

  • 730 compute nodes in water-cooled racks
    • initially 472 at the end of 2018
  • thousands of CPU cores
  • 864 AMD Radeon Instinct MI210 GPUs
  • 192, 768, 128 or 512 GB of RAM per node
  • EDR and FDR InfiniBand interconnects (2:1 blocking fat-tree network)
  • a parallel scratch filesystem with a capacity of 2.4 PB and an aggregated bandwidth of 27 GB/s
Nodes CPU Cores
per CPU
Cores
per Node
Threads
per Node
RAM
per Node
IB GPU
412 2x Intel Xeon Gold 6148 (Skylake) 20 40 80 192 GB EDR n/a
72 2x Intel Xeon Gold 6148 (Skylake) 20 40 80 768 GB EDR n/a
138 2x Intel Xeon E5-2640 v4 (Broadwell) 10 20 40 128 GB FDR n/a
108 2x AMD EPYC 7452 32 64 128 512 GB EDR 8xAMD Instinct MI210 64 GB